标题:Big Vertical Mixer
作者:
日期:2020-05-28 14:52:19
内容:

 Installation:
   - It adopts vertical parallel stirring method to install the machine. Generally it has 3-5.5m high of the machine, it is better to have forklift and truck crane, to prevent deformation caused by accident happened and breaking the barrel.
   - It is use of 380V, 3-Phase, 50Hz power supply, constant power supply should be guaranteed.
   - The electric motor it must be follows the direction of arrow to running.
   - Empty test run machine first after connected well power line, if it is happen run in reverse, it can be adjust the current position in two firewire.
 


返回列表 网站首页