标题:3 in 1 Dehumidifier Dryer
作者:
日期:2020-05-18 14:19:32
内容:

1, please complete the specified grounding project. (Yellow power cord)
2, please fasten the connector and connecting terminal of the machine body and measuring wire.
3, before the line test, the power must be cut off, and the voltage will be measured with a multimeter after 10 minutes to ensure safety before the test.
4, the door of the control box must not be opened at will during the power-on process.
5, it is forbidden to touch the machine body, control part and other accessories with wet hands.
6, please do not damage the wire, do not put pressure on the wire, do not place heavy objects on the wire, and do not pinch the wire. May cause electric shock.


返回列表 网站首页