标题:PLA Dehumidifying Dryer with Mixer
作者:
日期:2020-06-19 15:23:54
内容:

1, please carry out electrical construction in accordance with the "Electrical Equipment Standards", "Inner Line Regulations" and this operating manual.
2, please do not use the power supply other than that specified.
3, please complete the specified grounding project. (Yellow power cord)
4, please fasten the connector and connecting terminal of the machine body and measuring wire.
5, before the line test, the power must be cut off, and the voltage will be measured with a multimeter after 10 minutes to ensure safety before the test.
6, the door of the control box must not be opened at will during the power-on process.


返回列表 网站首页