标题:Automatic Conveying System
作者:
日期:2020-05-21 11:55:39
内容:

Control Room Maintenance:
1. Before starting work, firstly check whether the blower is normal and whether there is abnormal noise.
2. The high-efficiency filter must be cleaned before each shift.
3. Check the cooler for water leakage.
4. Regular maintenance according to the below table.

Item What to Check Checking Method Checking Times
Blower abnormal noise Listen every 30 days
High Efficency Filter dust Watch every 7 days
Dust Collector dust Open the collector every day
Switch Whether the switch acts Test every 30 days


返回列表 网站首页