simple description:3-in-1 machine is mainly used for engineering plastics with strong hygroscopicity such as PA, PC, PBT, PET, ABS, etc. for efficient dehumidification dryer operation, and is connected with hot air hopper dryer.
weight :420.00
unit weight:KG
characteristic:For Plastic Material Drying
patent:Intelligent Drying System Control Software
manufacturer:HENGJU
Producing country:CHINA
Product alias:3-in-1 machine
3 in 1 Dehumidifier Dryer Product introduction
3 in 1 Dehumidifier Dryer parameter
Model
HCF-200300
Dryer Hopper
Capacity (KG)
300
Heat Protection Material
Fiberglass+Staninless Steel
Dry-Air Dew point
-35℃ to -45℃
Temperature (℃)
80-180
Air Flow (m^3/h)
200
Blower Power (KW)
2.2
Regeneration Blower (KW)
0.375
Drying Heater (KW)
18
Regeneration Heater (KW)
7.2
Pipe Sizes
Drying (mn)
63
Cooling (lnch)
3/4"
Regeneration (mn)
51
Conveying Blower (KW)
2
Conveying Distance (m)
Stage 1
6-10
Stage 2
6-10
Hose Size (Inch)
1.5
Sensor Hopper Capacity (L)
7.5
Vacuum Hopper Capacity (L)
7.5
Dimension LxWxH (cm)
123×95×239
Approx.Net Weight (KG)
420
Remark: Compressed air Pressure must more than 0.4MPa,air flow more than 15L/H; We reserve the right to change spencifications without prior notice.
3-in-1 machine
3 in 1 Dehumidifier Dryer Equipment principle
3-in-1 machine
3 in 1 Dehumidifier Dryer application
In the production process of plastic products, the moisture problem bothers all processors. The rotary dehumidifier is widely used for drying all kinds of plastics, especially engineering plastics with strong hygroscopicity (such as PA, PC, PBT, PET, etc.) for high-efficiency dehumidification.
3-in-1 machine
3 in 1 Dehumidifier Dryer Precautions
1, please carry out electrical construction in accordance with the "Electrical Equipment Standards", "Inner Line Regulations" and this operating manual. 2, please do not use the power supply other than that specified. 3, please complete the specified grounding project. (Yellow power cord) 4, please fasten the connector and connecting terminal of the machine body and measuring wire. 5, before the line test, the power must be cut off, and the voltage will be measured with a multimeter after 10 minutes to ensure safety before the test. Product alias: